The junction in Ashton-on-Ribble, Tulketh, is a major pinch-point in the city’s travel network Pic: Google

People are being warned to expect delays during work due to start shortly at a busy junction in Preston.

Temporary traffic lights will be operating the junction of Tulketh Brow, Water Lane and Fylde Road from Sunday 29 January to Friday 10 February while work takes place on the existing signals.

Fylde Road will be closed at the junction for traffic heading eastwards towards the city centre on Sunday 29 January, and will be closed for traffic heading westwards away from the city centre on Sunday 5 February, with signed diversions in place.

Read more: New traffic rules planned for two Preston city centre junctions

The work being carried out is to replace existing cables and ducting underneath the road, along with poles and signal equipment which has become unreliable and needs to be renewed.

County Councillor Rupert Swarbrick, cabinet member for highways and transport, said: “I’m grateful to people for planning their journeys around the work which we need to carry out at this very busy junction, and for their patience, as some delays will be unavoidable.

Read more: Levelling Up cash to pay for Old Tram Bridge replacement

“Some of the traffic signals and electrical cabling at this junction has reached the end of its operating life and needs to be replaced to make sure the junction continues to operate safely.

“By doing this now in a planned way we will avoid a longer period of disruption if the equipment was fail.”

Advance warning signs have been placed near the site this week to alert people to the upcoming work.

Read more: See the latest Preston news and headlines


Support Blog Preston: Keep our community reporting going and view the website without any adverts too. Sign up for a membership today.

Stay updated: Keep in touch directly with the latest headlines from Blog Preston, join our WhatsApp channel and subscribe for our twice-a-week email newsletter. Both free and direct to your phone and inbox. Help us report too, by contacting us if you see something we should be reporting on.

Read more: See the latest Preston news and headlines

See us on Google: Set Blog Preston as your preferred source so you don’t miss our stories and see us first when you’re searching

Add Blog Preston as a preferred source on Google
Share: WhatsApp Email Copy Link Facebook X LinkedIn
Article categories
Ashton-on-Ribble, Preston News, Riversway, Roads, Transport, Tulketh

14 Comments

  1. cadlee says:

    And what do they propose as an alternative route? This is the alternative route to the current Ringway closure. Ridiculous.

  2. MrFedup says:

    Great timing.

    They block Strand Road and then decide lets mess up surrounding roads as well.

    Clueless

  3. me me says:

    https://uploads.disquscdn.com/images/f0e120806dafacfe4ab1f6b4547a461317b425b78fc9d4e56554699de49bcbc6.gif

    I am totally confident they could plan a set of overnight works compressed to limit damage but they seem keen to spread work out over 2 weeks.