2025 is set to be a big year for Preston – with a raft of long-running regeneration projects set to come to a conclusion and several other schemes poised to […]
Work on the new Old Tram Bridge has been paused for the winter as part of the planned project timeline. Those using Avenham Park will notice the removal of site […]
Parts of Preston are set to look different in the next 12 months as new street scenes, bridges and more take shape. The last year has seen significant spades in […]
Storm Ashley has seen a further setback to the work on the Old Tram Bridge’s new crossing. Gale-force winds and a swollen River Ribble mean the scaffolding put up in […]
Part of the construction site on the new Old Tram Bridge has been washed away in Monday’s heavy rain. Work on replacing the River Ribble footbridge has been taking place […]
Preston’s Old Tram Bridge was in such poor condition that it took less than half the time to demolish it than had been expected, the Local Democracy Reporting Service (LDRS) […]
There’s a new view across the River Ribble from Avenham Park as the final part of the tram bridge has been removed. Work to demolish the Old Tram Bridge has […]
Preston’s Old Tram Bridge is nearly demolished after over a week of hard work. The demolition began on Tuesday (20 August) with visual pieces of the structure now removed. It […]